当前位置: > 实习报告 > 实习报告

xxxx年10月实习报告英语版

发布时间:2026-08-27 11:44:35 浏览次数:99 格式:DOC

导语:这是一份简洁实用的英文实习报告模板,专门为十月实习场景设计。语言地道、脉络分明,兼顾专业性与可读性,方便快速套用、修改和提交。内容留白合理,写起来不费劲,交得也体面。

报告属性

适用对象 英语不太熟但得写英文报告的大学生,刚实习完、有点懵但想认真写的新人。
使用场合 适合大学生实习结束交学校的正式报告,也用来向老师汇报实践收获,或者作为英语课作业提交。
核心内容 讲实习怎么帮自己把课堂知识用起来,特别是电气设计里防雷接地这些实操难点,还带点成长感悟。
内容体量 3150字
报告关键词 毕业实习阶段 电气专业实训 高层建筑设计 防雷接地专项

报告正文

graduation report

graduation practice is to complete the final phase of the universitys course to be the most important section of the practice. practice is every qualified students must havean e_perience that allows us to enhance professionalism in the practice of awarenessand practice of awareness. we practice during the process of training units in theschool and support, more guidance of e_perts, through training we learned a lot in class, not simply the knowledge of school for our future design and lay a solid foundation. at the same time allow themselves to contact the school for the purpose ofinternship training of our ability, the five-week internship to increase their ability to havea lot of knowledge, greatly improved.

graduation purpose

internship is designed to improve the ability of students and social contacts and to understand and master, verify and consolidate learned basic course content. enable students to understand the modern high-rise building design and the actual construction of electrical easy to ignore the problem, students integrate theory with practice, love the professional, enthusiastic, committed to thinking of chinas modernization drive.

graduation content

to achieve the above objective practice, practice the main content should include:

1. understand the internship process and production organization of productionmanagement.

2. understand the performance of some electrical products and features.

3. control low-voltage distribution system design, weak part of the design, lighting,part of the design, dynamic part of the design, lightning protection and grounding part of the design.

4. institute of electrical equipment used in operating methods and the basic working principle.

although this practice is only 3 weeks time, but during that time, the theory for somecommon things, with perceptual awareness, feel benefit.

here are some of my summary of the internship period, and their feelings and e_periences. to carry out their work in the future, and the future work of great help tome.

visit the west campus, dongsheng building and city hall and linear low-voltagepower distribution room, and the laying of the roof there are weaknesses in the design of some of mine. now i will e_plain in detail the building of the lightning protection and grounding

1. basic principles:

lightning protection design of technical measures should be the e_isting national standard lightning protection design of buildings for lightning protection, refer to uilding lightning protection design standard corresponding requirements, the use of ball lightning rod protection method, the use of other potential join the most important safety measures.

2. anti-cloud-to-measure, should meet the following requirements:

(1) air terminals using the lightning rod, lightning protection zone (network), or a combination of both, it should be used as a metal roof building air terminals, but should be consistent with regulatory requirements. containing radioactive material should not be used air terminals. the elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on. protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation obstruction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should be separate lightning rod, with protection, lightning protection device connected with the roof.

(2) deflectors should give priority to the use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.

when the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding device based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate, for the measurement, an e_ternal artificial grounding and equipotential bonding for use.

brick buildings surrounded by a separate deflectors in the e_ternal walls and the installation of 1.8 meters from the ground disconnected card. the 1.7 meters to 0.3 meters underground for some protective measures should be taken.

(3) the use of grounding devices should give priority to the building of reinforced concrete base. a reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay-40_4 pit in the outer groove to form a circular grounding. 2 3 下一页

when the transformer and the work of the diesel generator neutral grounding, electrical protective earth grounding system work and share weak grounding device, the grounding resistance should be less than 1 euro. use common grounding, the weak systems should their equipment room, and building insulation grounding stud, with more than 25 mm2 copper cable or wire welded steel pipe made through a separate drop, the foundations of buildings connected with the ground plate. weak system of general requirements for grounding resistance of less than 4 ohms, should be an independent ground system view often  bo_u chile to catch car owner thereupon low ash wood ho chant argon ∮? 0 meters.

3. sideswipe against mine measures should meet the following requirements:

height over 30 meters of reinforced concrete structures, steel structures, should take the following anti-swipe mine and equipotential bonding of the protective measures:

(1) steel frame and reinforced concrete should be connected to each other;

(2) should be used within the steel column or reinforced concrete columns reinforced as a lightning protection device deflectors;

(3) should be 30 meters and over the railings on the e_ternal walls, doors, windows and other large metal objects and lightning protection device is connected;

(4) vertical laying of metal pipes and metal top and low-end devices to be connected with the mine;

(5) columns and ring beam without the buildings, walls should be laid at intervals of around three out of galvanized round steel ¢ 12 to do the grading rings, a combination of columns and ring beam, the use of steel for the ring beam grading ring. all the building every three vertical metal pipe connected with a grading ring. grading ring should be connected with the lightning protection device deflectors.

4. lightning induction of measures, should meet the following requirements:

(1) the protection of metal objects within the building ground, is the main measure lightning induction. therefore, the building housing the equipment, pipelines, and other major metal frame should be close to receiving the grounding or electrical equipment, lightning protection grounding device

(2) parallel to the laying of pipes, cables metal jacket structure and a long metal object, the spacing is less than 100mm should be used jumper wire, cross-junction spacing should not e_ceed 30m; crossing clearance less than 100mm, the should be across the intersection.

5. lightning invasion wave of measures, should meet the following requirements:

(1) line of low voltage lines should be buried with the cable directly into the home end of the cable jacket or the protection of metal pipe on the device receiving the lightning protection and grounding; if connected to overhead lines should be changed into the household 50m cable, cable for connection at arrester should be installed, and with the cable metal sheath, steel and iron insulator feet, fittings, etc. together, the impulse grounding resistance should not e_ceed 10 ohms. if overhead wires are used, the arrester should be installed into office.

(2) overhead and underground metal pipes, should be in and out of buildings and lightning protection grounding device connected at.

fi_ed on the building of holiday lights, aviation obstruction lights and other electrical equipment of the line, should be based on the importance of building the mine to take corresponding measures invasive radio waves:

a. no metal or electrical equipment protection network should cover the protection of air terminals within;

b. the line leads from the distribution bo_ should wear steel. ends of the pipe is connected with metal distribution bo_; the other side of the metal casing and electrical equipment, protective cover is connected, and lightning protection devices connected to your nearest roof. pipe should be located off the middle of the jumper.

third, and e_perience

this internship, i learned that the size of the plant level, the production process and the production of some conventional products, the study design in the future i believe there will be more help.

in addition, i feel that through this internship for me after the choice of electrical equipment, lighting, power, systems, lightning protection and grounding aspects of the design will be very helpful thank the school and the teacher gave us this gui internship opportunities.

报告格式怎么写

有标题“graduation report”,分块写purpose/content/experience,每块小标题加粗感明显,结尾有总结和感谢。

xxxx年10月实习报告英语版

这是一份简洁实用的英文实习报告模板,专门为十月实习场景设计。语言地道、脉络分明,兼顾专业性与可读性,方便快速套用、修改和提交。内容留白合理,写起来不费劲,交得也体面。
推荐度:
点击下载文档文档为doc格式

延伸阅读

相关分类 内容标题 说明
英语实习报告 英语教育个人实习报告 使用场景:小学英语教学、教育实习阶段 [详情]
11月商务英语专业实习报告 内容简介:一、实习目的了解led灯这个行业,提高自己的学习能力和搜集资料的能力,提高理论与实际相结合的能力,提... [详情]
英语工作报告 英语教学工作自查报告 使用场景:初一教学周期、7a教材启用期 [详情]
英语教师个人研修计划 内容简介:一、指导思想为切实提高自身整体素质,遵照校教研工作计划,以学校的教学教研工作为指导,立足课堂、革新教... [详情]
英语教学报告 小学英语教师述职报告 使用场景:三年级英语教学、五年级英语教学 [详情]
英语专业学生的实习报告 内容简介:英语专业学生的实习报告范文20xx年的x月xx日到x月xx日,这短短的四周,是我次学习当老师的教学实... [详情]
英语社会报告 英语实践报告 内容简介:20xx年的x月xx日到x月xx日,这短短的四周,是我次学习当老师的教学实习周。在这段时间,我收获了... [详情]
英语专业大学生社会实践报告 使用场景:寒假社会实践、英语专业调研 [详情]
英语综合报告 英语教师实习报告总结 使用场景:小学实习期、班主任代管期 [详情]
英语述职报告 英语教师职称述职报告 内容简介:时间过的真快,转眼有一学年过去了。蓦然回首,往事历历在目。回顾这个学期,感觉自己已然成熟了许多。为今... [详情]
小学英语教师年度个人述职报告 使用场景:年度教学总结、新教师入职首年 [详情]

相关英语范文

  • 11月英语教师实习报告
  • 11月英语教师实习报告 1070人关注

    实习的经历虽已经过去,可我还会回头去看一下我在那里留下的脚印,我相信那不会是我旅途的归宿,而是我充满挑战和希望的开始!回顾这8天的时间我是专心的,但专心不一定等 ...[更多]

  • 5月最新英语专业实习报告
  • 5月最新英语专业实习报告 1062人关注

    一、实习目的到所学专业所应用的相关单位如外资企业、翻译公司、旅行社等部门对所学专业应用范围有一个初步了解从而明确学习目的、方向,也为以后的工作奠定基础。二、实习 ...[更多]

  • 英语专业大学生实习报告精选
  • 英语专业大学生实习报告精选 1042人关注

    我是一名应用英语专业的学生。在即将毕业的这几个月里,我主要负责的工作内容是办公室文秘。在这一过程中,我采用了看、问、学等方式,初步了解了公司文秘工作中的具体业务 ...[更多]

  • 英语师范实习报告
  • 英语师范实习报告 1038人关注

    基本情况1、课堂教学:完成教案数为8份,上课节数为12节2、班主任工作:组织了一次“怎么样学好英语”的主题班会;在班上组织了一次以纪念长征胜利70周年的诗歌朗诵 ...[更多]

  • 商务英语专业实习报告3000字
  • 商务英语专业实习报告3000字 1038人关注

    商务英语专业实习报告3000字范文大学生是“天之骄子”,是社会的宠儿可是现在随着高校的扩招,大学生所面临的,将是社会进步所要求的不断提升素质和能力的压力。平时在 ...[更多]

  • 商务英语专业实习报告
  • 商务英语专业实习报告 1036人关注

    实习目的:为了巩固大学期间所学到的商务英语专业知识。提高实际操作技能。丰富实际工作和社会经验。掌握操作技能。将所学知识运用于实际工作。实习内容:按照老师的安排。 ...[更多]

  • 英语专业实习教育总结报告
  • 英语专业实习教育总结报告 1012人关注

    1、实习单位介绍1.1实习时间:20xx年12月7日—20xx年1月3日1.2单位简介:汤原县高级中学创办于1980年,是一所县级重点高中。学校坐落 ...[更多]

  • 英语专业大学生实习报告
  • 英语专业大学生实习报告 1002人关注

    英语专业大学生实习报告范文大学的最后的一个学期,我来到一家翻译公司实习。我应聘的职务是英语校对,刚开始我对这个工作不是很了解,以为就是检查检查错误就可以了,然而 ...[更多]

  • 英语专业实习报告结尾参考
  • 英语专业实习报告结尾参考 997人关注

    在家呆了两天,就匆匆赶去上海学习,经过十六天的中级口译的集训,认识了不少人,也越来越意识到自己水平的不足,特别是词汇量。在我们学校我自认为自己口语方面,特别是语 ...[更多]

  • 英语专业实习调查报告
  • 英语专业实习调查报告 991人关注

    实习的目的和意义:对学生已学部份理论知识进行综合运用的培训,加强学生对社会和了解,培养和训练学生认识,观察社会以及分析解决问题的能力, 提高学生的专业技能,实习 ...[更多]

写英语教育实习报告报告常见误区

1 把反思写成优点罗列加“今后将努力改进”的万能结尾。
2 把听课记录写成课堂实录或教材目录,全是“教师讲解过去时用法”这种干巴条目。